Fall planting project planned?

Always Call 811 Before Digging

Kansas 811 and Missouri One-Call encourage people to make a free call 3 working days before digging to know what’s below.

When calling 811, homeowners and contractors are connected to their local one-call center, which will identify affected member utility companies, who will then send professional locators to the requested digging site to mark the approximate locations of underground lines with flags, spray paint or both.

Striking a single line can cause injury, repair costs, fines and inconvenient outages. Every digging project, no matter how large or small, warrants a call to 811. Installing a mailbox, building a deck, planting a tree and laying a patio are all examples of digging projects that need a call to 811 before starting.

“Throughout the year, we remind homeowners and professional contractors alike to call 811 before digging to eliminate the risk of striking an underground utility line,” said Max Pendergrass, Public Relations Coordinator for Kansas 811, “It really is the only way to know which utilities are buried in your area.”

The depth of utility lines can vary for a number of reasons, such as erosion, previous digging projects and uneven surfaces. Utility lines need to be properly marked because even when digging only a few inches, the risk of striking an underground utility line still exists.

Visit www.call811.com, www.kansas811.com, or www.mo1call.com for more information about 811 and safe digging practices.

Leave a Reply